Concept information
Preferred term
strategy
Type
-
CHT concept
Broader concept
Scope note
- An approach or line to take, designed to achieve a long-term aim. Strategies can exist at different levels – at the corporate, programme and project level. At the project level, PRINCE2 defines four strategies: Communication Management Strategy, Configuration Management Strategy, Quality Management Strategy and Risk Management Strategy.
hasConceptStatus
- kandidaat (nl)
In other languages
-
Dutch
URI
https://data.cultureelerfgoed.nl/term/id/cht/f802d01d-c23d-4006-8d58-bc733783e2dd
{{label}}
{{#each values }} {{! loop through ConceptPropertyValue objects }}
{{#if prefLabel }}
{{/if}}
{{/each}}
{{#if notation }}{{ notation }} {{/if}}{{ prefLabel }}
{{#ifDifferentLabelLang lang }} ({{ lang }}){{/ifDifferentLabelLang}}
{{#if vocabName }}
{{ vocabName }}
{{/if}}