Concept information
Preferred term
tolerance
Type
-
CHT concept
Broader concept
Scope note
- The permissible deviation above and below a plan’s target for time and cost without escalating the deviation to the next level of management. There may also be tolerance levels for quality, scope, benefit and risk. Tolerance is applied at project, stage and team levels.
hasConceptStatus
- kandidaat (nl)
In other languages
-
Dutch
URI
https://data.cultureelerfgoed.nl/term/id/cht/eeac07f4-f648-4721-880a-16dfbdfe72ec
{{label}}
{{#each values }} {{! loop through ConceptPropertyValue objects }}
{{#if prefLabel }}
{{/if}}
{{/each}}
{{#if notation }}{{ notation }} {{/if}}{{ prefLabel }}
{{#ifDifferentLabelLang lang }} ({{ lang }}){{/ifDifferentLabelLang}}
{{#if vocabName }}
{{ vocabName }}
{{/if}}