Skip to main content

Search from vocabulary

Content language

Concept information

Preferred term

exception plan  

Type

  • CHT concept

Broader concept

Scope note

  • This is a plan that often follows an Exception Report. For a Stage Plan exception, it covers the period from the present to the end of the current stage. If the exception were at project level, the Project Plan would be replaced.

hasConceptStatus

In other languages

URI

https://data.cultureelerfgoed.nl/term/id/cht/f39209b5-edcd-4c09-abe4-d1b151a5440a

Download this concept:

RDF/XML TURTLE JSON-LD Created 6/20/17, last modified 4/13/18