Concept information
Preferred term
contingency
Type
-
CHT concept
Broader concept
Scope note
- Something that is held in reserve typically to handle time and cost variances, or risks. PRINCE2 does not advocate the use of contingency because estimating variances are managed by setting tolerances, and risks are managed through appropriate risk responses (including the fallback response that is contingent on the risk occurring).
hasConceptStatus
- kandidaat (nl)
In other languages
-
Dutch
URI
https://data.cultureelerfgoed.nl/term/id/cht/9782b87a-c2cc-41b9-8bd7-5614d3a30073