Skip to main content

Search from vocabulary

Content language

Concept information

abstract concepts > highlight report

Preferred term

highlight report  

Type

  • CHT concept

Broader concept

Scope note

  • A time-driven report from the Project Manager to the Project Board on stage progress.

hasConceptStatus

In other languages

URI

https://data.cultureelerfgoed.nl/term/id/cht/80892ccd-b534-4334-b0fd-0effccd95a81

Download this concept:

RDF/XML TURTLE JSON-LD Created 6/20/17, last modified 4/16/18