Concept information
Preferred term
end stage assessment
Type
-
CHT concept
Broader concept
Scope note
- The review by the Project Board and Project Manager of the End Stage Report to decide whether to approve the next Stage Plan. According to the size and criticality of the project, the review may be formal or informal. The authority to proceed should be documented as a formal record.
hasConceptStatus
- kandidaat (nl)
In other languages
-
Dutch
URI
https://data.cultureelerfgoed.nl/term/id/cht/0bd20f57-7bf7-48df-81e2-2df487371417
{{label}}
{{#each values }} {{! loop through ConceptPropertyValue objects }}
{{#if prefLabel }}
{{/if}}
{{/each}}
{{#if notation }}{{ notation }} {{/if}}{{ prefLabel }}
{{#ifDifferentLabelLang lang }} ({{ lang }}){{/ifDifferentLabelLang}}
{{#if vocabName }}
{{ vocabName }}
{{/if}}